Our solar power investments — a key step in our sustainable manufacturing strategy — have been completed.

We have reached a total installed capacity of 6.803 MWp: 3.991 MWp on the roof of our new facility and 2.812 MWp at our existing facility.

These investments allow us to optimize energy costs while reducing our carbon footprint and prioritizing environmentally responsible steel production.